Projects

Complete Reconstruction of Reclaimer А2RsВ12500 at Mini Maritsa Iztok

As part of its investment program, Mini Maritsa Iztok EAD has entrusted Rotek Ltd. with a complete modernization of the control system and operational cabling for reclaimer  А2RsВ12500 at the “Troyanovo-North” mine. The project represents a full-scale upgrade, delivering a modern automation solution built on world-class industrial standards.

🛠️ Turnkey Engineering Project

The scope of the project includes:
  • Development of a detailed electrical design;
  • Delivery and installation of all control equipment;
  • Execution of functional and load tests (including a 72-hour run);
  • On-site training and certified center-based technical courses.

⚙️ Allen-Bradley PLC at the Core

The control system is based entirely on Allen-Bradley programmable logic controllers (PLC), chosen for their:
✅ Robust design suitable for harsh, high-vibration environments;
✅ Protection rating up to IP54 and compliance with DIN VDE, IEC, ISO, and SIL standards;
✅ Native support for decentralized Fieldbus architecture over ControlNet and Ethernet/IP;
✅ Real-time diagnostics, remote access, and HMI integration.

⚡ Smart Control of Industrial Power

The new system includes:
  • Replacement of thyristor rectifiers and variable frequency drives;
  • HMI operator terminals with Bulgarian SCADA interfaces;
  • Comprehensive monitoring: temperatures, currents, inclinations, conveyor slippage, etc.
Each drive group is independently monitored, and emergency operation modes are available in case of motor or component failure.

🧠 Rotek Ltd. – Trusted Engineering and Delivery Partner

In addition to supplying Allen-Bradley hardware, Rotek Ltd. performs:
  • Full system design tailored to site conditions;
  • Programming and integration of all software;
  • SCADA visualization and commissioning;
  • Training of 6 electricians and 3 automation engineers;
  • Delivery of complete technical documentation and diagnostics tools.

🔐 Safety, Performance, and Reliability

The system offers:
  • Emergency and repair operation modes;
  • UPS-powered backup for the entire control infrastructure;
  • Alarms and system logs saved for over 30 days;
  • Compliance with all safety, fire, and vibration protection requirements.

✅ Conclusion

This project showcases how Allen-Bradley’s advanced automation platform, combined with the proven expertise of Rotek Ltd., can transform critical mining infrastructure into a smart, safe, and sustainable system. The  А2RsВ12500 reclaimer now stands as an example of world-class automation applied in Bulgarian industry.